Irrigation Engineering [1]

41) The first watering, when the crop has grown a few centimetres, is called paleo.

  • (a) Agree
  • (b) Disagree

42) The crops require maximum water during

  • (a) first watering before sowing the crops
  • (b) last watering before harvesting
  • (c) first watering when the crop has grown a few centimetres
  • (d) all of the above

43) The maximum depth in soil strata, in which the crop spreads its root system, and derives water from the soil, is called

  • (a) kor depth
  • (b) root zone depth
  • (c) delta
  • (d) overlap allowance

44) The depth of root zone is 90 cm for

  • (a) wheat
  • (b) sugar cane
  • (c) rice
  • (d) cotton

45) The duty at outlet is called capacity factor.

  • (a) Correct
  • (b) Incorrect

Scroll to Top