Irrigation Engineering [1]
106) The alignment of a canal
-
(a) should be such, so as to ensure minimum number of cross drainage works
-
(b) on a water shed is the most economical
-
(c) should avoid valuable properties
-
(d) all of the above
107) Inundation canals draw their supplies from rivers
whenever there is a ................. stage in the river.
-
(a) low
-
(b) high
-
(c) medium
108) In side slope canal, cross-drainage works are
completely eliminated.
109) A contour canal
-
(a) is most suitable in hilly areas
-
(b) irrigates only on one side
-
(c) is aligned parallel to the contour of the country
-
(d) all of the above
110) Which of the following is the correct sequence of the
parts of a canal system ?
-
(a) Head works, distributary, branch canals and minor.
-
(b) Head works, main canal, branch canal, distributary and minor.
-
(c) Head works, main canal, branch canal, minor and distributary.
-
(d) none of the above